PlayHaven Green Building Project
HomeDescriptionSponsorsProjectsID-CGID

 

BUILDING SITE: Energy Audit - Prior to Purchase (March 2008).

Preliminary Energy Audit Report (800 KB) : March 2008 -- This document when combined with the Energy Rating Results is the baseline. With it we know what needs to be done and can make intelligent priority decisions about the order in which repairs are made.

The Energy Rating Report (138 KB) : April 2008 -- Results were surprisingly positive after reading the preliminary report. The structure is only 4 points away from qualifying to earn an Energy Star rating (if that were available to an existing structure). And while the insulation product itself is less than desirable at this time, the building is tight enough as is to update other things first... this is rather unusual in that insulation is normally the first thing a homeowner should correct.


BUILDING SITE: Acreage and Buildings as Purchased (July 2008).

Aerial-PlayHaven
Front: 2nd Drive
Front from Main Drive
Front of House
Garage
Back of House
Field to South with Barn and Pond
View to West acres


PreviouslyatthePHGBP

 
| PHGB Project Home | Description | Sponsors | Gallery | Resources/Links | Intuitive Design Home |
     
  copyright © 2012 Intuitive Design